Skip to main content

Cosa Resources – Results From 13 Drill Holes Along The Cyclone Trend At Murphy Lake North JV Project

The KE Report Sep 14, 2026 8:31

Summary

Cosa Resources completed a 13-hole, 6,752-metre drill program along the Cyclone Trend at Murphy Lake North, with every hole intersecting structure or alteration.

The N-fault is the most prominent basement structure intersected so far — follow-up drilling is planned next winter along with the S-fault.

An ~C$16M treasury fully funds 2027 programs at Murphy Lake North and the Darby JV, both with Denison Mines as partner.

Drilling also mobilizes soon at Darby and in Q4 2026 at the Aurora project, where Traction Uranium funds 100% of the work.

Management frames Cyclone as early-stage: the trend remains open for several hundred metres of strike with basement-hosted potential still untested.